Heritage Farm – B
Inspected By: Tejas | Inspection Date & Time: 28/04/2025 14:28:46
Score | 95.24% |
---|---|
Main Entrance | 3.57 |
General | 14.29 |
Living Room | 11.90 |
Kitchen | 13.10 |
Study/TV Room | 9.52 |
Courtyard | 11.90 |
Pool | 15.48 |
Terrace/Massage Room | 8.33 |
Main Entrance
- Is the main gate easy to operate?Yes
NA - Is the surrounding compound damage-free?Yes
- Are all pathway lights working?Yes
- Is the pathway area damage-free?No
Internal road block stone road disengaged.