Villa Nikko (Cunchelim 2087)

Inspected By: Akash | Inspection Date & Time: 24/09/2024 17:14:08

Score 91.67%
Main Entrance 2.38
General 14.29
Living Room 11.90
Kitchen 11.90
Study/TV Room 8.33
Courtyard 13.10
Pool 14.29
Terrace/Massage Room 8.33

Main Entrance

  • Is the main gate easy to operate?Yes
  • Is the surrounding compound damage-free?No
    Wall as crack
  • Are all pathway lights working?No
    Few light are not working
  • Is the pathway area damage-free?Yes