Aldona 7600 – Common Project

Inspected By: TEST | Inspection Date & Time: 25/06/2024 18:23:11

Score 67.86%
Main Entrance 2.38
General 7.14
Living Room 10.71
Kitchen 9.52
Study/TV Room 4.76
Courtyard 9.52
Pool 11.90
Terrace/Massage Room 5.95

Main Entrance

  • Is the main gate easy to operate?No
    Test
  • Is the surrounding compound damage-free?No
    Test
  • Are all pathway lights working?Yes
    Test
  • Is the pathway area damage-free?Yes
    Test